New Facebook Data centre, Clonee. Co. Meath. Ireland


Project: New Facebook Data centre, Clonee. Co. Meath. Ireland.

Products: Flexi heavy – Modular Frameworks & Flexi Access – Bespoke access platforms.

Services: Air-handling units & associated access requirements.

Roof build-up: Warm roof design – PIR/PUR insulation with PVC/TPO field membrane.

 

The new €200 million Facebook Data Centre in Clonee, Co Meath in Ireland will be one of the most advanced and energy efficient data centres in the world. Featuring the latest I.T. servers, storage and networks all powered by 100% renewable energy.

Pump House were proud to have been chosen as the preferred supplier of building services support systems to the project, with support frames required to fourteen rooftop air-handling units. Each framework was also accompanied by a bespoke access platform to one longitudinal side of the air-handling units for maintenance purposes.

The air-handling unit frameworks had to achieve specific target heights of 800mm and 1000mm in height above the finished roof level, whilst also contending with a 2-degree roof fall. Pump House supplied purpose made leg assemblies to their heavy duty Flexi-Frames to achieve these specific project requirements.

The access solutions were designed to comply with current British Standards, and were delivered in flat packed kits for quick assembly on site. Dornan Engineering the Mechanical contractors working on the project, were delighted with the install of our products.